Latest Projects
We modernize the main drives for the finishing section of Bar Mill #3 at Al Jubail, originally supplied by Danieli. The turnkey project involves installing new 690-Volt drives on the existing footprint and interfacing these to the existing automation.
LOCATION : Jubail, YEAR : 2006-2007, COMPANY : Sabic., CONSULTANT : Sabic, WORK TYPE : Factory Building, SCOPE : Civil & Bldg Works And Equipment Setup With Overhead Crane.
platform for a wire and rebar mill including water treatment plant, billet bay, storage bay, as well as sub-stations and offices for operations and facilities. The plant is mainly divided in two levels. The ground floor where all conduits, cable tray, pumps and machineries are mounted
Messaeid 'A' Power Plant 2000 MW, Construction of Power plant 2000 MW at Messaed
world's largest DR (Direct Reduction) plant with a capacity of 1.75 million t/yr. Hot rolled steel products plant sucessfully constructed 2008 .
Lorem ipsum dolor sit amet elit. Phasellus nec pretium mi. Curabitur facilisis ornare velit non vulputate. Aliquam metus tortor
© Arabian Core Contracting, All Right Reserved.
Designed By ACC